9LIU Ning1, ZHANG JianXin2, LIN Wei3, CHENG WuYI4 & CHEN ZuYu5 1 Ministry of Water Resources of the People’s Republic of China, Beijing 100053, China,2 Bureau of Hydrology of the Ministry of Water Resources of the People’s Republic of China, Beijing 100053, China,3 Sichuan Hydrographic and Water Resources Survey Bureau,Chengdu 610031, China,4 HydroChina Chengdu Engineering Corporation, Chengdu 610072, China,5 China Institute of Water Resources and Hydropower Research, Beijing 100044, China.Draining Tangjiashan Barrier Lake after Wenchuan Earthquake and the flood propagation after the dam break[J].Science China(Technological Sciences),2009,52(4):801-805. 被引量:34
10LI TieJian1,WANG GuangQian1,XUE Hai2,3 & WANG Kai4 1 State Key Laboratory of Hydroscience and Engineering,Tsinghua University,Beijing 100084,China,2 Yellow River Engineering Consulting Co.,Ltd.,Zhengzhou 450003,China,3 North China Institute of Water Conservancy and Hydropower,Zhengzhou 450008,China,4 China Institute of Water Resources and Hydropower Research,Beijing 100038,China.Soil erosion and sediment transport in the gullied Loess Plateau:Scale effects and their mechanisms[J].Science China(Technological Sciences),2009,52(5):1283-1292. 被引量:11