摘要
南钢高炉自1991年11月底实行高炉标准化操作至1994年7月,高炉利用系数提高0.567t/(m^3·d),崩悬料次数减少114次/月,焦比降低6.0%。
Since the end of November,1991,the standardized operation is carried out on the blast furnace of Nanjing Iron & Steel Works-By the July of 1994.utilization coefficient of BF was raised by 0.567t/(m3·d),slips and hanging reduced 114 times per month and coke rate decreased by 6.0%.
出处
《炼铁》
北大核心
1994年第6期21-24,共4页
Ironmaking
关键词
高炉
标准化
操作
管理
blast furnace,standardization,operation,management