200kt/a硫酸装置于1993年8月28日建成投产。在试车过程中,有些设备存在一些问题,致使系统开停车频繁。经多次整修,系统生产能力达到设计要求。经过七个月的试生产,进一步明确了今后需要重点解决的问题。
kt/a sulphuric acid plant was put into operation on August 8, 1993. Troubles with someequipments resulted in frequent stoppages duringthe trial run. The output reached the design target after several overhauls. Some problems remained to be dealt with after seven months' trialrun.