摘要
本文介绍了我国在发展燃煤联合循环发电技术方面所进行的前期和近期工作,以及国外三座增压流化床联合循环电厂的调试和运行情况,并提出关于我国发展燃煤联合循环的一些建议。
This paper describes the earlier and later technology works of developing coal fired combined cycles for electricity and makes some suggestions on the development of coal fired combined cycles in China.Experiences with conimisson and operation for 3 PFBC units in the foreign countries are described.
出处
《煤炭转化》
CAS
CSCD
北大核心
1994年第4期11-20,共10页
Coal Conversion
关键词
煤气化
联合循环
增压流化床
洁净煤
发电
integrated gasification combined cycle,pressurized fluidized bed combustion combined cycle,second generation pressurized fluidized bed combustion combined cycle