3US DOE.Energy Information Administration[A].Annual Energy Review[R].Washington:US DOE,1998.
4Robert A Lisauskas.Low-NO x Slagging Combustion for a Low Emission Boiler System[A].Evolution of Combustion Technology to Support National Energy Needs[C].Orlando:Babcock Borsig Power,Inc,Sheraton World Resort,2002.
5Beittel R,Darguzas J N,Ruth L A.LEBS Plant Leaves the Drawing Board[J].Power Engineering,1998,102(4):31-36.
6Wu S F,Mckinseyz R.Performance Prediction of a Repowering Application Derived from a High-Performance Power System(HIPPS)[J].Energy Convers Mgmt,1997,38(10):1 275-1 282.
7Tidd.Hot Gas Clean Up Program-Final Report[R].Columbus:American Electric Power Service Corporation,1995.
8Sera T,Inoue K,Tatani A,et al.Development of Fixed Bed Type Hot Gas Clean-Up Unit for Coal Gasified Gas[J].Mitsubishi Heavy Indust Tech Rev,1996,33(1):14.
9Zheng Ligang,Furinsky Edward.Comparison of Shell,Texaco,BGL and KRW Gasifiers as Part of IGCC Plant Computer Simulations[J].Energy Conversion and Management,2005,(46):1 767-1 779.
10Ruth L A. The U. S. department of energy combustion 2000 program: clean, efficient, electricity from coal [J]. Energy Convers Mgmt, 1997, 38 (10-13): 1 249-1 257.