摘要 通过分析华中、华东能源资源及能源远景供需矛盾,表明三峡工程的建成对解决华中、华东用电供需矛盾起着一定作用,但后继电源不足,金沙江溪落渡、向家坝水电站“西电东送”是解决三峡后继电源不足的最佳方案。 Analysis has been carried out on the status of energy resoures and the supply and demand contradiction of energy for far future in Central China and East China. Analystical result shows that after commissioning of Three Gorges Hydropower Station,the supply and demand contradiction of power in Central China and East China will be mitigated to a certain extent,but,in these areas,the energy supply will still be of shortage. In order to solve this problem,it is a good solution that follwing the Three Gorges Project,the Xiluodu Project and the Xianjiaba Project will be built as soon as possible,and the electricity produced by them will be transmitted to Central China and East China.
作者 黄永绥
出处 《人民长江》 北大核心 1994年第11期1-5,共5页 Yangtze River
关键词 三峡工程 水能资源 水力输送 设计 Waterpower resources Hydraulic transport Design program Optimum alternative
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部