本文阐述了乌鲁木齐网调峰运行的现状。在预测1995~2020年各水平年乌网所需调峰容量的基础上,提出要解决乌网调峰问题,除建设常规水电站向乌网输送调峰容量外,主要还应在负荷中心区建设抽水蓄能电站。文中对调峰电源的建设规模建成投产时间等也提出建议。
This paper illustrated the present states of peaking operation of Wulumuqi powerGrid.In accordance with total requirement of annual energy generation and maximum load capacity forecasted in 1995 2020,the pumped storage stations should be constructed besides theconstruction of hydropower stations in future in order to supply peaking power to Wulumuqigrid. The plan of electric stations and its finish date are also suggested.