摘要
在大型水利水电工程中,施工设施的厂址选择过程是复杂的,限制条件相互关联、相互制约,给决策分析带来困难.本文在建立厂址优化模型时,将数学模型和模糊解释模型有机地结合起来分析厂址的选择,充分反映决策问题的主次关系,层次结构关系.实例分析说明这种决策方法能降低优化模型的线数,减少计算难度,使决策更合理、有效.
For a large-scale construction syStem in watarconservancy and electric power prokct,the location of the temPOraryfacettes is concerned in a lot of constrants.And this paper introducesexperts knowledge and experiment into makingdecision of plantlocation,combines the mathematical model and fuzzy inter pretivemodel,and shows the relationships of the model between the primaryand the secondary.The case study illustrates that it reduces demensionof the model,and computational complexity,mobes the decision modelmore reasonable and effective.
出处
《水电能源科学》
北大核心
1994年第2期113-118,共6页
Water Resources and Power
关键词
解释模型
厂址选择
水利工程
optimization location,facility layout,interpretive model