摘要
本文介绍了丹江口左岸联接段土石坝渗流问题有限元研究成果.研究成果表明,左岸土石1+160~1+197坝段的渗流集中现象不明显,坝体渗流稳定,该坝段没有必要再打混凝土防渗墙.
Results of studies on Seepage flow problem of the earth-rock fill dam of the leftbank of Danjianagkou Hydroproject are presented in this paper. The results indicate that concen-trated Seepage flow in 1 + 160 ~ 1 + 197 monolith at the left bank are nonsignificant, and theSeepage flow through the mass of dam are safe, and it is not necessary to design a concrete cutoffwall at the monolith.
出处
《水利水电技术》
CSCD
北大核心
1994年第7期57-61,共5页
Water Resources and Hydropower Engineering
关键词
土石坝渗流
防渗墙
有限元
Danjiangkou Hydro Project, Seepage concrete cutoff wall, earth-rock dam, finite element project