摘要 装设反击式水轮机的长引水系统水电站,为解决压力上升率和转达上升率这对相互制约的矛盾,可分别采用调压井、调压阀,合理确定上升率指标,以及充分发挥制造厂的技术优势和保证作用等措施来解决.西洱河梯极电站,根据四座电站各自情况,分别采用了不同方式来解决这个问题,可供工程设计参考. In construction of a hydroelectric power project with a long power tunnel system, equipped with reaction turbines, different measures can be taken to resolve the contradiction betweenpressure rise rate and speed rise rate. These measures include provision of a surge shaft or a pressureregulat1ng valve, reasonable determination of rise rate indexes, and giving full play to the superiorityof the manufacture and its guarantee. In construction of the four cascade hydroelectric power projectson the Xi-er river in Yunnan Province of China, different measures has been adopted to resolve thiscontradiction according to the different conditions of the projects, which can give a reference to thedesign of other hydroelectric power projects.
作者 青长庚
机构地区 昆明勘测设计院
出处 《水利水电技术》 CSCD 北大核心 1994年第9期17-21,共5页 Water Resources and Hydropower Engineering
关键词 梯级水电站 压力 调节 计算 regulating guarantee, pressure rise rate, speed rise rate
  • 相关文献

同被引文献8

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部