摘要
通过对尼泊尔马相迪工程的长、大隧洞施工与国内用钻爆法开挖水工隧洞的现状相比,提出了加快长、大隧洞开挖施工速度的一些想法,诸如加强设备及备件管理,采用先进施工工艺,改变地质与观测工作现状等。
Making a comparison between the excavation of the Maxiangti large long tunnel in Ne pal and that of the hydraulic tunnels by drilling and blasting method at home, the writer proposes his opinions on accelerating the excavation of large long tunnels, such as strengthening the management of construction equipment and spare parts, adopting advanced technology, improving geological and observation work.
出处
《水力发电》
北大核心
1994年第4期40-42,共3页
Water Power
关键词
水工隧洞
工程施工
钻爆法
tunnel, construction, drilling and blasting method