摘要 投资能力不足严重地制约了水电的发展。通过按地区或按流域组建水电开发有限责任公司,赋予其滚动开发的权力和责任。可以充分发挥水电后效大、成本低的优势和潜力。企业在开始还资后,即具有融资能力;还贷结束后,如能在成本电价的基础上增加一部分作为企业滚动开发基金,则水电将具有强大的自我投资能力。 Being short of funds for hydropower construction is a serious question in hydropower development. If a new way is adopted, that is,forming hydropower development limited-liability companies in line with river systems or regions, to which are authorized rolling development, the greater benefit and the low cost of the hydropower station at the later stage can be fillly utilized. Then the enterprices will also be capable of circulating the necessary funds after they begin paying loans, and after the loans are payed off, an increase on the electricity cost price may be added as the fund for rolling development. As a result the hydropower enterprices will have a strong capability of self-investment.
作者 寇日明 孙烨
出处 《水力发电》 北大核心 1994年第4期5-8,共4页 Water Power
关键词 水电资源 滚动开发 电价 rolling development. electricity price, capacity of circulating necessary funds, investment capacity, fund needs
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部