摘要 五强溪水电站主体工程混凝土浇筑垂直运输在大坝两岸分高、低层布置4台平移式20t缆索起重机。其中2台高缆从德国引进,属世界上首次采用全遥控的缆机,同时也是国内塔架最高的缆机;2台低缆属我国目前自行设计制造安装的规格最大、速度最高的缆机。 In construction of Wuqiangxi Hydsopower Station, four movable 20-t cable cranes were used to transport concrete the main structures.The four cranes were instelled on upper and lower platforms at both banks respectively. The two cranes on the upper platforms characterized by full remote control with the highest tower in China. the other two cranes on the lower platforms were the largest ones manufactured by China in terms of size and speed The selection, arrangements and installation of cable cranes are explained. The effect of four joint operated cable cranes is evaluated.
出处 《水力发电》 北大核心 1994年第11期64-67,共4页 Water Power
关键词 五强溪水电站 缆索起重机 安装 选型 布置 Wuqiangxi Hydropower Station, selection of cable cranes, arrangement, installation, effect of application
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部