期刊文献+

变区间线性化方法及淤地坝系库容、建坝时序的同步优化 被引量:5

Synchronous Optimization among Silt Arrester System,Dam Height and Damming Period with Region-Varied Linear Programme
下载PDF
导出
摘要 该文提出的变区间线性化方法是对现有线性化方法的改进,应用于淤地坝系的优化规划效果很好。该方法与常用的非线性规划相比具有如下优点:计算结果更为稳定、可靠,计算时间大为缩短;对非线性规划无力求解的复杂问题也能求出最优解。文中的实例说明变区间线性化方法有能力将拦泥库容(坝高)、滞洪库容(坝高)、建坝时序进行同步优化。 A new method of region- varied linearization in this article is an improvement over thepresent linear programme. Compared to the commonly used non- linear programme,the optimiza-tion in silt arrester svstem effects better for its more sterile and reliable calculation in shorter time.and more effective solution to complex problems,which cannot get good results with non-linearprogramming.This article illustrates that the region-varied linear programme can optimize syn-chronously the dam height to retard mud,the dam height to retention flood and the damming peri-od.
作者 武永昌
机构地区 西北林学院
出处 《水土保持学报》 CSCD 北大核心 1994年第4期60-65,90,共7页 Journal of Soil and Water Conservation
关键词 数学模型 变区间线性化 淤地坝系 坝系 坝高 regioi-varied linear programme linearization of non-linear silt arrester system
  • 相关文献

参考文献7

  • 1武永昌,水土保持学报,1992年,6卷,1期
  • 2李智录,水土保持学报,1991年,5卷,4期
  • 3武永昌,水土保持学报,1991年,5卷,1期
  • 4刘肇--,灌排工程系统分析,1988年
  • 5姚汝祥,水资源系统分析及应用,1987年
  • 6韦澄芬,优化数学要义,1985年
  • 7希梅尔布劳 D M,实用非线性规划,1981年

同被引文献22

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部