结合我国南方B港重力沉箱式深水码头建设工程实例,介绍重为470t的沉箱和重为180t的卸荷板的运输、吊装方法,对有关问题进行探讨,并提出一些建议。
Combining construction practice of the gravity caisson deepwater quay wall at B Port of South China, the transportation & hoisting method of caisson of 470 t and relieving platform of 180 t weight are introduced.Relevant problems are discussed and some suggestions put forward.