摘要
本文扼要的表述了金沙江干流丰富的水能资源和溪洛渡水电站优越的开发条件,并对45年来梯级开发研究的历史进程、溪洛渡枢纽前期工作的艰难和近年来全国有识之士的宣传推动活动予以介绍,为今后开发金沙江和建设溪洛渡水电站的人们了解过去,特提供这份历史记录。
Abundant water resources of main Jinsha River and favourable conditions for building Xiluodu Wa-terpower Station are briefly described here. The historical review of research on development of power sta-tions in cascade during 45 years, the difficultides in preparing works before construction at Xiluodu project and activities for promoting the project by men of insight in China in recent years are introduecd.The histori-cal records are provided for men who will construct Xiluodu Waterpower Station.
出处
《四川水力发电》
1994年第3期21-28,62,共9页
Sichuan Hydropower
关键词
金沙江
梯级开发
溪洛渡水电站
水能资源
Jinsha River,develop in cascade,Xiluodu Waterpower Project, preparing works before con-struction,historical review, prospect.