摘要
通过香山变电站地基处理前期的沉降观测资料,利用几种从实测资料推算最终沉降量的方法来预估地基土的最终沉降量,然后进行对比和分析,选择一种最合适的计算方法来推算地基土的最终沉降量,从而提高预估最终沉降量的精度。
Based on the early observed data of settlement in the XiangShan substation foundation ,where I used several calculating method on final settlement to predict the final settlement and had a contrastion and analysis .At last ,I chose the best method to caculate the final settlement in order to increase the accuration in prediction of final settlement.