期刊文献+

网格计算环境下基于任务池的任务调度方法 被引量:4

A task scheduling way based on the taskpool in grid computing environments
下载PDF
导出
摘要 任务调度是网格计算的关键技术之一。对网格计算任务调度特点及典型的任务调度策略进行了分析,提出了一种基于任务池模型的分级调度方法,该方法通过在网格系统中建立相对稳定的计算资源视图,在不同规模、级别上实现局部自治系统之间的协同工作,通过建立并维护任务池和资源池,对网格环境中动态变化的资源和任务进行管理,来保持系统资源之间的共享关系和高度可控性。实验结果表明,本调度方法具有较高的执行效率和加速比。 Task scheduling is one of the critical technologies of Grid Computing. Task scheduling traits and typical task scheduling strategies of grid computing are analyzed. A different level scheduling way based on the mission pool model is proposed. By creating relatively stable calculation resources view in grid system, this way can realize cooperative work among local autonomy systems on different scales and levels; By creating and maintaining the task-pool and resource-pool, this way can manage dynamic resources and tasks in grid environment to keep share relation among system resources and high controllability. The results of an experiment indicate that the proposed scheduling way has fairly good executive efficiency and the rate of acceleration.
出处 《黑龙江大学自然科学学报》 CAS 北大核心 2005年第1期117-121,125,共6页 Journal of Natural Science of Heilongjiang University
基金 哈尔滨市科技基金资助项目(2002AA1CG05-10)
关键词 网格计算 任务调度 任务池 资源管理 grid computing task scheduling task-pool resource management
  • 相关文献

参考文献6

二级参考文献5

共引文献51

同被引文献42

  • 1肖万贤,刘江宁.企业数据集成模型的研究[J].计算机工程与科学,2004,26(5):49-51. 被引量:23
  • 2熊磊,李元香.网格计算资源调度策略的三级模式[J].计算机工程与应用,2005,41(1):96-97. 被引量:8
  • 3罗寿文,李代平,张信一,方海翔.基于网格的并行算法研究[J].计算机工程与应用,2005,41(8):75-77. 被引量:7
  • 4刁冠文.现代企业生产运作管理方法的选择——JIT、MRPⅡ、ERP的选择[J].天津市财贸管理干部学院学报,2007,9(1):11-13. 被引量:9
  • 5Martino D, Sub V. Optimal Scheduling in a Grid Using Genetic Algorithms. International Parallel and Distributed Processing Symposium(IPDPS'03), 2003:148-154.
  • 6Ernemann C, Hamscher V, Schwiegelshohn U, et al. On Advantages of Grid Computing for Parallel Job Scheduling. 2nd IEEE / ACM International Symposium on Cluster Computing and the Grid (CC- GRID2002),2002:3]-38.
  • 7Ranganathan K, Foster I. Decoupling Computation and Data Scheduling in Distributed Data-Intensive Applications. 11th IEEE International Symposium on High Performance Distributed Computing, 2002:352-258.
  • 8Subramani V, Kettimuthu R, Srinivasan S, et al. Distributed Job Scheduling on Computational Grids Using MultipIe Simultaneous Requests. 11th IEEE Internationai Symposium on High Performance Distributed Computing, 2002:85g-366.
  • 9Chen ttongtu, Maheswaran M. Distributed Dynamic Scheduling of Composite Tasks on Grid Computing Systems. 1 6 International Parallel and Distributed Processing Symposium (IPDPS'02),2002:88--97.
  • 10Arora M, Das S K, Biswas R. A De-Centralized Scheduling and Load Balancing Algorithm for Heterogeneous Grid Environments. International Conference on Parallel Frocessing Workshops. 2002:499-505.

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部