摘要
阐述海力#801大型打桩船采用S-280型双作用液压锤和GPS卫星定位技术,在杭州湾恶劣的风、浪、流的条件下,下沉超长、超大直径钢管桩的施工技术。
This paper introduces the piling construction technique of ultra-long and ultra-large-diametered steel pipe pile performed by Haili #801 large piling driving vessel adopting Type S-280 double-functioned hydraulic hammer and GPS satellite positioning technology under bad wind, wave and flow conditions in Hangzhou Bay.
出处
《水运工程》
北大核心
2005年第2期75-80,共6页
Port & Waterway Engineering