摘要
分析了火电机组施工过程中工程质量与施工进度的对立统一关系,并用来指导妈湾电厂一期工程的施工.提出了对安装焊口进行复评复检的管理方法.组织了对安装焊接的质量跟踪监督管理,效果良好.
The relation of unity and opposites between engineering quality and construction schedule is analyzed in the construction course of thermal power sets. This relation is used for guiding the first stage engineering construction of Mawan Thermal Power Station. The control method is presented for reviewing and checking the welding interface of installation.Moreover, some methods of tracing, surveillation and management are organized for the welding quality of installation and good results are obtained.