摘要
通过对肇庆市跃龙电排扩建工程枢纽布置方案的对比,说明工程枢纽布置方案的比较对整个工程造价的降低以及效益的提高会产生积极的影响。
The comparison for the complex layout scheme of yuelong electrical drainage station extension project illustrates the comparison for that has brought about the active influence to lower the cost of the general project and improve the benefit of.
出处
《吉林水利》
2005年第3期39-40,44,共3页
Jilin Water Resources
关键词
跃龙电排扩建工程
枢纽布置
方案比较
Yuelong Electrical Drainage Station Extension project
complex layout
scheme compared