摘要
结合工程实例 ,介绍了屋架预应力钢筋的张拉及孔道灌浆的过程控制 ,阐述了预应力钢筋张拉施工工艺 ,指出采用正确的施工工艺 。
Combined with practice,the construction quality control of presstessed reinforcement in pre-stress and duct grouting process is introduced as well as practical construction technology.Author points out correct construction method ensure good construction quality.
出处
《山西建筑》
2005年第6期105-106,共2页
Shanxi Architecture
关键词
预应力张拉
孔道灌浆
钢筋
pre-stress method,duct grouting,reinforcement