摘要
应用计算机仿真技术、动画技术及优化原理,建立了矿井采掘接替计划屏幕动态显示仿真系统,该系统己在实际中得到初步应用。
In the paper,the simulation system of dynamically displaying the getting-driving relay plan of Coalmine is set up by using computer technique,animation technique and optimization principle. This system has preliminarily used in some coalmines.