摘要
概述了广东省第一台300MW燃煤机组-沙角A电厂5号机组采用湿法脱硫投产后取得的成效,介绍了石灰石-石膏湿法脱硫装置烟气系统的设计情况,重点介绍烟气系统的运行情况,对存在的问题提出建议。
The article summarizes the effect of the wet desulfurization device for Unit 5 of Shajiao A Power Plant, i. . e the first 300MW coal - fired unit in Guangdong Province. It introduce the design of the flue gas system in the wet limestone/gypsum FGD flue gas system. The operation of flue gas system is mainly analyzed. The article also puts forward some solutions to the existing problems.
出处
《自动化与仪器仪表》
2005年第2期39-41,53,共4页
Automation & Instrumentation