摘要
应用模糊数学综合评判的基本原理,根据参考文献[1]的规范,探讨高压输电线路工程施工质量的评定方法,通过综合考虑工程各验收项目质量状况的检查结果,得出整个工程施工质量的综合评分.
Based on the principle of fuzzy comprehensive evaluation,this paper discusses the method for evaluating the construction quality of the high-voltage overhead line project.With comprehensive consideration of various acceptance and inspection results on the project,a comprehensive qualification score for the whole project can be obtained.
出处
《兰州工业高等专科学校学报》
2005年第1期29-31,47,共4页
Journal of Lanzhou Higher Polytechnical College