期刊文献+

论四川西部水电开发期望值及约束条件

Expectation and Constraint Conditions for Hydropower Development in Western Region of Sichuan Province
下载PDF
导出
摘要 对四川西部"三州"水力资源经济可开发量作了新的探讨,进而对其开发现状、前景及问题作了一定的剖析与论证,既明确指出"三州"脆弱的生态链条应当是"三州"水电开发的主要约束条件,同时也证明了这座水电"富矿"不仅对于振兴全省经济具有不可替代的绝对意义,而且还关系到三峡水利枢纽可否较长时期地正常运行。 Economic development for water power resources at 'Three Autonomous Prefectures' in west Sichuan is newly discussed . Present state, prospect and problems in the water power development are analyzed . It is clearly indicated that the weak ecological chain is the main constraint condition of development for water power resources at 'Three Autonomous Prefectures', while it is proved that this rich water power resource not only plays an unique role in economic growth in Sichuan, but also is of vital importance to long-term normal operation of Three Gorges Project .
作者 阮基康
出处 《四川水力发电》 2005年第1期7-10,21,共5页 Sichuan Hydropower
关键词 四川西部 水电开发 生态问题 约束条件 支柱产业 “三州”水力资源 western region of Sichuan water power development ecological issue constraint condition pillar industry water power resources at 'Three Autonomous Prefectures'
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部