摘要
焦炉基础顶板采用普通脚手钢管固定架固定预埋管和清扫管,可明显缩短工期、降低工程造价、保证工程质量。
Engineers adopted common scaffolding steel pipe fixing frames to fix preburied pipes and cleaning pipes in top boards of foundations of coke-ovens. This method can shorten construction time obviously, decrease construction cost and ensure construction quality.
出处
《施工技术》
CAS
北大核心
2005年第3期31-32,共2页
Construction Technology
关键词
脚手架
钢管固定架
预埋管
施工方法
scaffolding
steel pipe fixing frame
preburied pipe
construction method