摘要
通过对高架桥支模常用3种形式受力特点、搭设结构对计算的影响分析,提出了高架桥支模的施工方案编制及安全检查重点。
In this article, the author analyzes influence on calculation of stress features and installation structures of three usual formwork installation methods for fly-over crossing bridges,and provides key points for making construction plans of fly-over crossing bridge formwork installation and for safety checking.
出处
《施工技术》
CAS
北大核心
2005年第3期68-69,共2页
Construction Technology
关键词
高架桥
排架支模
受力特点
施工方案
安全
fly-over crossing bridge
bent formwork installation
stress feature
construction plan
safety