摘要
介绍了某年产60万t焦化厂中2#焦炉及煤塔电气安装施工方案、施工保证措施以及相关配套设施和必备条件等。
This paper introduces the electrical installation schemes, construction guaranteeing measures, relative auxiliary equipment and necessary conditions of No.2 coke-oven and coal-tower of the coke-oven plant with annual output of 600 thousand tones.
出处
《科技情报开发与经济》
2004年第12期378-379,共2页
Sci-Tech Information Development & Economy
关键词
电气设备安装
施工方案
焦炉
煤塔
installation of electrical equipment
construction scheme
coke-oven
coal-tower