期刊文献+

花溪水库双支墩大头坝的改建及加高设计 被引量:3

Modification and heightening of Huaxi Massive-head Double Buttress Dam
下载PDF
导出
摘要 将混凝土大头坝改造成实体重力坝并加高,尚未见工程先例.花溪大头坝已建成 41年,因供水要求的增加,需要将大坝改造成实体重力坝并加高.工程的实施要达到新老混凝土有机结合,形成同一个受力体,需要解决的技术问题很多.对一些关键的技术问题的研究结果和设计方案作简要介绍. The modification of a massive-head buttress dam into a gravity dam with heightening of its body is unprecedented so far. Huaxi Massive-head Buttress Dam was built 41years ago. The increasing demand for more water supply makes it necessary to rebuild and heighten the dam. In the practice of the engineering, the old concrete and the fresh concrete are required to be combined together organically and to create a whole force bearing body, for which many technical problems are to be solved therein. So far as this project is concerned, a brief introduction to the design and the results of the research on some key problems is given hereinafter.
出处 《水利水电技术》 CSCD 北大核心 2005年第3期31-34,共4页 Water Resources and Hydropower Engineering
关键词 加高 重力坝 大坝 水库 供水 支墩 改建 新老混凝土 工程 建成 Huaxi Reservoir massive-head double buttress dam cavity backfill modification and heightening key techniques
  • 相关文献

参考文献1

  • 1朱伯芳.大体积混凝土温度应力与温度控制[M].北京:中国电力出版社,2003..

共引文献5

同被引文献25

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部