浅谈青藏铁路多年冻土区路基处理的技术措施及监理控制要点
被引量:4
Talk About Technical Measure and Main Points of Supervision Control for Subgrade in Permafrost Soil Zone on Qinghai- Xicang Railway
摘要
描述多年冻土的工程分类、主要病害类型及青藏铁路的路基设计原则,重点介绍了 高含冰量冻土地段路基处理的各种技术措施及其监理控制要点。
出处
《路基工程》
北大核心
2005年第2期71-74,共4页
Subgrade Engineering
同被引文献10
-
1Ling F,Zhang T J. Critical embankment height in feng- huo mountainous area along the qinghai - tibet Railway [ J ]. Cold Regions Science and Technology, 2003 ( 2 ) : 685 - 689.
-
2Lachenbruch. Periodic heat flow in a stratified medium with application to perma- frost problems [ M l- United States Government Printing Office, 1959:30 - 265.
-
3Ling Feng,Zhang Tingjun. Critical Embankment Height in Fenghuoshan Mountainous Area along the Qinghai-Tibet Railway I-J]. ISTP Proceedings of 8th International Conference on Permafrost, 2003,2:685-689.
-
4Lachenbruch. Periodic Heat Flow in a Stratified Medium with Application to Permafrost Problems [M]. United States Gov- ernment Printing Office, 1959.
-
5章金钊.工业隔热材料在多年冻土区的应用研究[c].第一届全国寒区环境与工程青年学术会议论文集.兰州:兰州大学出版社,1994.
-
6李勇,韩龙武,许国琪.青藏铁路多年冻土路基稳定性及防治措施研究[J].冰川冻土,2011,33(4):880-883. 被引量:24
-
7蒋富强.高原多年冻土区铁路路基结构问题[J].中国铁路,2002(4):57-59. 被引量:3
-
8田亚护,刘建坤,钱征宇,何平.多年冻土区含保温夹层路基温度场的数值模拟[J].中国铁道科学,2002,23(2):59-64. 被引量:32
-
9王森鹤.青藏铁路冻土路基合理结构的选用[J].路基工程,2004(2):50-53. 被引量:1
-
10章金钊,姚翠琴.青藏高原多年冻土地区的涵洞工程[J].冰川冻土,1993,15(2):363-369. 被引量:9
-
1黄宁.风沙地区路基设计原则和防治措施[J].黑龙江交通科技,2009,32(9):94-95. 被引量:1
-
2刘铮.丰碱连接线旧路加宽综合处治方案设计的几点思考[J].交通世界,2013(21):149-150.
-
3李户坤.路基设计原则和防治措施[J].中国科技纵横,2010(18):42-42.
-
4雷振武,王睿.甘肃省黄土地区路基设计要点[J].山西建筑,2012,38(3):145-146.
-
5王玥珩,王茹.多年冻土地区路基设计原则及其应用[J].民营科技,2013(4):343-343. 被引量:2
-
6蔡春旭.多年冻土地区路基设计原则及其应用[J].科技创业家,2012(24):14-14. 被引量:2
-
7章金钊.青藏公路多年冻土区路基设计原则与设计高度的演进[J].公路,2006,51(10):54-58. 被引量:3
-
8王运诗.青藏铁路多年冻土区路基设计原则与施工[J].安徽建筑,2009,16(2):81-83.
-
9赵军.青藏线多年冻土路基设计概述[J].铁道工程学报,2003,20(z1):29-32. 被引量:1
-
10赵军.青藏线多年冻土路基设计概述[J].路基工程,2003(6):27-30. 被引量:8