摘要
阐述了鞍钢新1#高炉煤气回收工艺及装备水平;介绍了配套TRT装置调试运行中出现的问题、解决办法并提出了建议。
The gas recovery process of new No.1 blast furnace and equipment of Anshan Iron & Steel Group Co. are expounded. The problems in commissioning of matching equipment for TRT device are presented. The solutions and suggestions are put forward.
出处
《冶金动力》
2005年第2期14-16,共3页
Metallurgical Power
关键词
环缝洗涤
高炉煤气
TRT
scrubbing of ring seam
blast furnace gas
TRT