摘要
阐述了在工程承包中,实行工程总承包和项目经理负责制,可以使承包方更有效地协调承包过程中的各个环节,及时解决其间的问题,从而加快工程进度。这是一条走向良性循环的轨道。
It indicates that for whatever project,the implementation of overall project contract and responsibility system by project manager can make the contractor effectively coordinate various links and timely solve the problems occurred in the period of contracting,thus speeding up the schedule of the project.This is the proper way towards a virtuous circle.