摘要
针对有色金属加工厂循环水泵站水专业设计的技术接口,从接收内部条件、收集外部条件、向相关专业提条件以及会审会签的过程中,探讨如何保证技术接口正确、完整,避免返工。
In view of technical interface designed for recirculation water pump station of the non-ferrous metals processing factory, the paper discusses how to ensure a proper and complete technical interface and to avoid mistakes or doing it over again in the process of incepting interior requirements and collecting exterior requirements upon the project, putting forward some technical conditions and requirements to relevant specialized departments, jointly checking up and finishing the signature by one and another on the blue prints of the project.
出处
《有色金属设计》
2004年第4期55-57,共3页
Nonferrous Metals Design
关键词
循环水泵站
技术接口
设计
探讨
Recirculation water pump station
technical interface
design
discussion