华蓥山电厂2x300MW工程汽机房通风方案介绍

HuaYingShan Power Plant 2x300MW Project Introdaction of Ventilating Scheme for Steam Turbine Building
下载PDF
导出
摘要 本文简要介绍了华蓥山电厂2x300MW 工程的汽机房通风系统设计,推荐采用自然进风、自然排风+辅助机械排风的通风方案。汽机房屋面设置屋顶自然通风器排风,除氧器间屋面设置屋顶风机排风。对火力发电厂汽机房的通风方式进行了一些描述,对目前常用的主要通风方式进行了简单的比较。提出了汽机房通风设计中应注意的问题。 Ventilating system desigh for the steam turbine builting of HuaYingShan power plant 2x300mW project is introduced in this aricle. Air Natural air intake, natural air Nexhaust +Axiliary mechinical air exhaust is recommended. Roof ventilators are setted on the roof of steam turbine builting for air exhaust, and roof fan setted on the roof of deaertor roof are used for air exhau. Some ventilating schemes which are used prequently are compared in this article. .Some poiuts which should be noticed in the ventilating desigh for steam turbine builting are brought forward.
作者 郝海洋
机构地区 西南电力设计院
出处 《制冷与空调(四川)》 2005年第1期35-40,共6页 Refrigeration and Air Conditioning
关键词 汽机房 屋顶自然通风器 气流组织 电厂 Steam turbine builting Roof natural ventilation Air flow organization ventilating effect
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部