摘要
以京沪铁路电气化工程北京至济南段为例,介绍了既有铁路电气化接触网工程施工工期的确定过程。
Taking for example the Beijing-Jinan segment of the Beijing-Shanghai railway electrification project, this article gives an introduction to the process of determining the construction period of catenary work of electrification projects of existing railways.Key Word: electrification of existing railway, catenary, construction period
出处
《铁路工程造价管理》
2005年第2期26-28,共3页
Railway Engineering Cost Management
关键词
既有铁路电气化
接触网
工期