通过在隧道施工项目管理中,遇到二次衬砌(复合式衬砌)表面出现裂缝问题的经历,从分析裂缝产生的原因入手,重点阐述了在施工管理中收缩裂缝产生的原因,并对此提出相应的控制措施。
In the management of tunnel construction projects, the problem of cracks in the surface of the secondary lining was once experienced. This article, starting with the analysis of the causes of cracking, places the emphasis on the analysis of the causes of the generation of the cracks attributable to the construction management, based on which control measures are put forward accordingly.
出处
《铁路工程造价管理》
2005年第2期29-31,共3页
Railway Engineering Cost Management
关键词
复合式衬砌
收缩裂缝
控制措施
分析
secondary lining, expansion crack, control measure, analysis