潜在故障状态可测的一种故障检查模型
被引量:2
A Failure Finding Model with a Potential Failure State
摘要
从系统的功能故障状态和潜在故障状态两方面讨论了故障检查模型,基于延迟时间模型推导了系统的期望可用度模型并对其适用性进行了讨论与验证.
出处
《军械工程学院学报》
2004年第2期6-10,共5页
Journal of Ordnance Engineering College
参考文献7
-
1Christer A.H.Innovatory decision making,the role and effectiveness of theories of decision in practice [R].London: Hodder & Stoughton,1973.
-
2Keller J K.Optimum checking schedules for the systems subject to random failure [J].Management Science,1974,21(1):256-260.
-
3Sim S H.Unavailability analysis of periodically tested component of dormant system [J]. IEEE Transactions on Reliability,1985,R-34(1):88-91.
-
4Sim S H.Reliability of standby equipment with periodic testing[J].IEEE Transactions on Reliability,1987,R-36(1):117-123.
-
5Vaurio J K.Unavailability Analysis of periodic testinged standby components [J].IEEE Transactions on Reliability,1995,R-44(3):512-517.
-
6Jardine A K S.Maintenance,Replacement and Reliability [M].UK:Pitman Publishing,1973.103-111.
-
7Baker R D,Wang W.Determining the delay time distribution of faults in repairable machinery from failure data [J].IMA Journal of Mathematics Applied in Business and Industry,1991,3(4):259-282.
同被引文献12
-
1曾声奎,赵延弟,张建国,等.系统可靠性设计分析教程[M].北京:北京航空航天大学出版社,2006.
-
2Das A N,Acharya D.Age replacement of componets during ifr de-lay time[J].IEEE Transactions on Reliability,2004,53(3):306-310.
-
3Peng Bo,Jin Xing,Wu Sai-hu,et al.Numerical analysis on themodel of periodic maintenance policy for component with latentfault[C]∥2011 IEEE International Conference on System Model-ing and Optimization.Chengdu:Institute of Electrical and Elec-tronics Engineers,2011:113-115.
-
4Peng Bo,Jin Xing,Lu Hai,et al.Study on the improved model ofperiodic maintenance policy for component with latent fault[C]∥2011 IEEE International Conference on System Engineering andModeling.Beijing:Institute of Electrical and Electronics Engi-neers,2011:320-323.
-
5Christer A H.Innovatory decision making,the role and effective-ness of theories of decision in practice[M].London:Hodder&Stoughton,1973.
-
6Christer A H,Wal1er W M.Reducing production downtime usingdelay time analysis[J].Journal of the Operational Research Socie-ty,1984,35(6):499-512.
-
7Wang W,Christer A H.Solution algorithms for a nonhomogeneousmulti-component inspection model[J].Computers&OperationsResearch,2003,30(1):19-34.
-
8J.莫布雷.以可靠性为中心的维修[M].机械工业出版社,1995,1-305.
-
9SAE JA 1012-A Guide to Reliability -Centered Maintenance (RCM), 2002,
-
10SAE JA 1011-Evaluation Criteria for Reliability -Centered Maintenance (RCM) Processes, 1999, 25-41.
二级引证文献11
-
1王珏.钢铁生产设备维修策略优化的探索与实践[J].宝钢技术,2010,3(1):54-57. 被引量:4
-
2昝翔,张仕新,刘艳超,李浩,韩朝帅.一种状态维修适用性的定量分析方法[J].设备管理与维修,2014(6):57-60.
-
3胡俊.视情维修在现代企业设备管理中的应用[J].铜业工程,2014(4):77-79.
-
4张仕新,昝翔,李浩,韩朝帅.状态维修理论及剩余寿命预测的研究现状与展望[J].兵工自动化,2014,33(9):15-20. 被引量:15
-
5张仕新,昝翔,李浩,韩朝帅.状态维修关键技术及应用的研究现状与展望[J].兵工自动化,2014,33(10):15-21. 被引量:7
-
6崔建国,傅康毅,齐义文,蒋丽英,刘海港.飞机液压系统库存备件综合保障决策方法[J].控制工程,2014,21(6):843-847.
-
7米根锁,张凤霞,魏蕾.基于剩余寿命的铁路轨道电路调整型维修方法研究[J].铁道学报,2015,37(4):69-74. 被引量:13
-
8董海鹰,黄巨朋,黄阿敏,杨立霞.基于Weibull分布的牵引变电所保护系统寿命预测[J].高电压技术,2015,41(11):3569-3575. 被引量:6
-
9陈嘉,刘聪聪,周德永.基于RCM的电力通信传输设备运维方法研究[J].中国设备工程,2019,0(21):83-85. 被引量:4
-
10吴波.基于寿命衰退的煤矿设备管理数字化转型研究[J].煤矿机械,2022,43(1):188-191. 被引量:4
-
1戴旭.太空,战争最后的高地[J].当代军事文摘,2007(3):8-10.
-
2杨宇.俄海基战略核力量的变化[J].国防科技(北京),2001(16):21-22.
-
3史宏博,李天阳.特殊的“军事训练”[J].解放军生活,2014(2):78-78.
-
4李仕松,左凯.一种新型的武器维修器材仓库作业系统概览[J].仓储管理与技术,1996(5):48-49.
-
5万明咏.库存武器维修中心建设应把握的几个环节[J].仓储管理与技术,1999(6):51-51.
-
6柏文华,左洪福,吕德峰,袁锴.基于延迟时间模型的民机部件维修优化方法[J].南京航空航天大学学报,2015,47(6):890-896. 被引量:3
-
7王伟.廉价武器,能否反潜?[J].世界军事,2006,0(11):78-80.
-
8李昊华.美俄开启新一轮核武竞逐[J].报刊荟萃,2015,0(11):59-60.
-
9揭开密码的神秘面纱[J].天天爱学习(五年级),2009(12).
-
10江南.水陆神兵——中国海军“两栖蛙人队”[J].少年科学画报(名枪版),2009(6):18-21.