期刊文献+

潜在故障状态可测的一种故障检查模型 被引量:2

A Failure Finding Model with a Potential Failure State
下载PDF
导出
摘要 从系统的功能故障状态和潜在故障状态两方面讨论了故障检查模型,基于延迟时间模型推导了系统的期望可用度模型并对其适用性进行了讨论与验证.
出处 《军械工程学院学报》 2004年第2期6-10,共5页 Journal of Ordnance Engineering College
  • 相关文献

参考文献7

  • 1Christer A.H.Innovatory decision making,the role and effectiveness of theories of decision in practice [R].London: Hodder & Stoughton,1973.
  • 2Keller J K.Optimum checking schedules for the systems subject to random failure [J].Management Science,1974,21(1):256-260.
  • 3Sim S H.Unavailability analysis of periodically tested component of dormant system [J]. IEEE Transactions on Reliability,1985,R-34(1):88-91.
  • 4Sim S H.Reliability of standby equipment with periodic testing[J].IEEE Transactions on Reliability,1987,R-36(1):117-123.
  • 5Vaurio J K.Unavailability Analysis of periodic testinged standby components [J].IEEE Transactions on Reliability,1995,R-44(3):512-517.
  • 6Jardine A K S.Maintenance,Replacement and Reliability [M].UK:Pitman Publishing,1973.103-111.
  • 7Baker R D,Wang W.Determining the delay time distribution of faults in repairable machinery from failure data [J].IMA Journal of Mathematics Applied in Business and Industry,1991,3(4):259-282.

同被引文献12

  • 1曾声奎,赵延弟,张建国,等.系统可靠性设计分析教程[M].北京:北京航空航天大学出版社,2006.
  • 2Das A N,Acharya D.Age replacement of componets during ifr de-lay time[J].IEEE Transactions on Reliability,2004,53(3):306-310.
  • 3Peng Bo,Jin Xing,Wu Sai-hu,et al.Numerical analysis on themodel of periodic maintenance policy for component with latentfault[C]∥2011 IEEE International Conference on System Model-ing and Optimization.Chengdu:Institute of Electrical and Elec-tronics Engineers,2011:113-115.
  • 4Peng Bo,Jin Xing,Lu Hai,et al.Study on the improved model ofperiodic maintenance policy for component with latent fault[C]∥2011 IEEE International Conference on System Engineering andModeling.Beijing:Institute of Electrical and Electronics Engi-neers,2011:320-323.
  • 5Christer A H.Innovatory decision making,the role and effective-ness of theories of decision in practice[M].London:Hodder&Stoughton,1973.
  • 6Christer A H,Wal1er W M.Reducing production downtime usingdelay time analysis[J].Journal of the Operational Research Socie-ty,1984,35(6):499-512.
  • 7Wang W,Christer A H.Solution algorithms for a nonhomogeneousmulti-component inspection model[J].Computers&OperationsResearch,2003,30(1):19-34.
  • 8J.莫布雷.以可靠性为中心的维修[M].机械工业出版社,1995,1-305.
  • 9SAE JA 1012-A Guide to Reliability -Centered Maintenance (RCM), 2002,
  • 10SAE JA 1011-Evaluation Criteria for Reliability -Centered Maintenance (RCM) Processes, 1999, 25-41.

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部