期刊文献+

一种新型冲洗式沉沙池的设计探讨 被引量:38

Design Discussion on A New-Type Scouring Sedimentation Basin
下载PDF
导出
摘要 在对各种类型沉沙池及适用条件进行分析的基础上,通过在沉沙池的首部加调流板、在溢流堰上沿水流方向设溢流槽、对冲沙廊道进行改进并设置辅助冲沙设施这3个方面对传统沉沙池进行了改进。提出了一种新型冲洗式沉沙池,并进行了模型试验。试验结果证明,这种新型冲洗式沉沙池可以大大提高沉沙池对悬移质泥沙的沉淀效率,并有利于泥沙的排除。 Based on analysing all kinds of sediment silting basins and their suitable conditions, the traditional sedimentation basin has been improved in three aspects, i.e., setting an adjusting flow board in the fore of setting basin, adding a spillway trough along the flow direction, and redesigning the flush gallery by adding auxiliary flushing facilities. Thus a new-type continuously scouring basin was proposed. The results of model experiment proved that the new-type setting basin can greatly improve the deposition efficiency of suspended sediment and help the excluding of silt.
出处 《长江科学院院报》 CSCD 北大核心 2005年第2期13-16,共4页 Journal of Changjiang River Scientific Research Institute
基金 教育部优秀青年教师资助计划项目(1862)
关键词 冲洗式沉沙池 调流板 溢流槽 冲沙廊道 scouring sedimentation basin adjusting-flow board spillway trough flush gallery
  • 相关文献

参考文献4

共引文献44

同被引文献276

引证文献38

二级引证文献163

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部