公伯峡水电站按"无人值班"(少人值守)的方式运行,控制电源系统的可靠性与稳定性直接关系到电站的安全稳定运行,针对这一特点介绍了公伯峡水电站控制电源系统的设计原则和基本配置。
The Gongboxia Hydropower Station is operated as an unattended power plant. The reliability and stability of the concrete power system is directly related to the safe and stable operation of the station. As to this feature, the design principle and basic collocation of the control power system is remarked.
出处
《西北水电》
2005年第1期73-75,共3页
Northwest Hydropower
关键词
公伯峡水电站
交直流控制电源
设计原则
设备选型
Gongboxia Hydropower Station
alternate/direct current
design principle