摘要
对二滩水电站弧形闸门支铰的受力情况进行了详细的计算分析,找到了闸门支铰移位、轴承端盖螺栓损坏的原因。根据现场的实际情况,对闸门进行了必要的复位处理,获得成功。
The stress on the arch gate arm has been analyzed and calculated in detail in Ertan Hydropower Plant so as to find the cause of the displacement of the gate arm and the break of the bearing end plate bolts. According to the site condition necessary treatment has been carried into execution to replace the gate arm successfully.
出处
《水力发电》
北大核心
2005年第2期65-67,共3页
Water Power
关键词
弧形闸门
关节轴承
移位
处理
二滩水电站
arch gate plain radial bearing displacement treatments Ertan Hydropower Plant