期刊文献+

基于集对分析的项目风险排序方法 被引量:16

A Project Risk Ranking Approach Based on Set Pair Analysis
下载PDF
导出
摘要 风险排序是项目风险管理的重要环节。在综述已有方法的基础上,提出一种基于集对分析的风险排序方法,计算了各种风险的联系度,建立两步循环算法,对项目风险按大小进行排序。最后,用一个实例说明了本方法的实用性。 Risk ranking is an important process in project risk management. In this paper, the application of SPA in risk ranking is presented, which includes review of risk ranking approaches, introduction of Connecting Degree (CD) that is a key role in SPA. Arithmetic and Tendency Grade (TG) of CDs, and a risk ranking approach proposed. Finally a case analysis is presented to illustrate the reasonability of this approach.
作者 高峰 陈英武
出处 《基建优化》 2005年第1期1-4,共4页 Optimization of Capital Construction
基金 国家自然科学基金项目(70272002)
关键词 项目风险 排序 集对分析 project risk risk ranking set pair analysis
  • 相关文献

参考文献12

  • 1蒋云良.基于同异反态势排序的学生成绩分析[J].数理统计与管理,2001,20(1):26-29. 被引量:34
  • 2Paul R, Garvey P R, Lansdowne Z F. Risk matrix: an approach for identifying, assessing, and ranking program risks[J]. Air Force Journal of Logistics. 1998, (25):16-19.
  • 3Lansdowne Z F. Ordinal ranking mettxxts for multicriterion decision making [J]. Naval Research Logistics,1996, (43) :613 - 627.
  • 4LanMowne Z F, Woodward B S. Applying the Borda method[J]. Air Force Journal of Logistics, 1996, (20):27 -29.
  • 5Lansdowne Z F. Risk matrix: an approach for prioritizing risks and tracking risk mitigation progress[A]. Proceedings of the 30th Annual Project Management Institute 1999 Seminars & Symposium[C]. Philadelphia, USA,1999.
  • 6Ward S C. Assessing and managing important risks [J].International Journal of Project Management, 1999, (6) :331 - 336.
  • 7James H. Lambert etc. Identification, Ranking, and Management of Risks in a Major System Acquisition [J].Reliability Engineering and System Safety 2001, (72):315-325.
  • 8周平,朱松岭,姜寿山.基于模糊层次分析法的航空项目风险管理研究[J].计算机集成制造系统-CIMS,2003,9(12):1062-1066. 被引量:24
  • 9Hyo-Nam Cho etc. A Risk Assessment Methodology for Incorporating Uncertainties Using Fuzzy Concepts [J].Reliability Engineering and System Safety 2002, (78) : 173- 183.
  • 10V. Carr & J. H. M. Tah. A Fuzzy Approach to Construction Project Risk Assessment and Analysis: Construction Project Risk Management System [ J ]. Advances in Engineering Software 2001, (32) :847 - 857.

二级参考文献8

共引文献59

同被引文献178

引证文献16

二级引证文献225

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部