国际工程承包商应对“不可抗力”风险的策略与实务 被引量:1

International Project Contractor’s Strategy Against Risk of Force Majuere and Its Practice
下载PDF
导出
摘要 国际工程承包商必须重视对“不可抗力”风险的研究与应对,避免因承揽项目心切而盲目让步,最终承担本该由业主承担的“不可抗力”风险。在应对“不可抗力”风险的过程中,签好合同是前提,风险管理是基础,积极索赔是关键,适当保险是保障。发生“不可抗力”风险的同时也伴有创收机遇,我国承包商要善于发挥优势,创造有利条件。 To avoid conceding blindly and undertaking the risk of “Force Majuere”, international project contractors should value the research on risk of “Force Majuere” and its application. In dealing with the potential risk, there are four points to remember: signing contract is a premise, risk management is a foundation, claiming positively is a key, and appropriate insurance is a guarantee. The occurrence of risk is always accompanied with opportunity of gain. Chinese contractors should make full use of their advantages, create beneficial surroundings and convert risk into economic benefit.
出处 《河海大学学报(哲学社会科学版)》 2005年第1期8-11,共4页 Journal of Hohai University:Philosophy and Social Sciences
关键词 FIDIC 不可抗力 风险管理 索赔 FIDIC force majuere risk management claim
  • 相关文献

参考文献10

二级参考文献24

  • 1郭水良,李扬汉.新外来杂草──常春藤叶婆婆纳[J].杂草科学,1996,14(3):6-7. 被引量:5
  • 2薛光,金中时,薛萍霞,施志平,徐世杰,娄远来,吴建荣,蒋玲秀.江苏省蒜地杂草的发生及消长规律[J].江苏农业科学,1997,25(2):34-38. 被引量:12
  • 3田威.FIDIC合同条件实用技巧[M].北京:中国建工出版社,1998..
  • 4王传丽,国际经济法案例评析,1999年
  • 5刘文华,新合同法条文解释与典型案例,1999年
  • 6田威,FIDIC合同条件实用技巧,1998年
  • 7 The World Bank.Standard Bidding Documents:Procurement of Works[S],1995.
  • 8 FIDIC.Conditions of Contract for Construction,first edition[S],1999.
  • 9 Smith G A.Beyond ADR-Dispute Reduction in the Construction Industry throughRealistic Contract Risk Allocation[A].International Symposium for The Organization andManagement of Construction[C],1996,2.
  • 10 GF-97-0208,水利水电土建工程施工合同条件[S].

共引文献47

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部