路桥过渡段容许差异沉降计算模型 被引量:19

Theoretical models of determining tolerable differential settlement at end of bridge
下载PDF
导出
摘要 为确定路桥过渡段桥台与引道之间的差异沉降,考虑行车的舒适,性和安全性,以人的振动频率和加速度最大瞬态振动值作为控制指标,建立了台阶状和折线形不设搭板与设搭板的路桥过渡段模型,提出以容许台阶高度和搭板容许纵坡变化值作为不设搭板与设搭板的路桥过渡段容许差异沉降,以三自由度体系作为单轮平整度测定车模型,以五自由度体系作为双轴车辆模型,而且五自由度体系中不能忽略车架的转动惯量.容许最大瞬态振动值为1.0 m/s2时,搭板容许纵坡变化计算值为0.42%,位于行车调查得到的0.4%~0.5%范围内,表明本文建立的模型是合理的. In order to determine the tolerable differential settlement between bridge abutment and approach embankment, taking into account the comfort and safety of riders, the paper put forward the riders' vibration frequency and maximum transient vibration value of acceleration as controlling indices, built-broken lines models and step models for bridge approaches with and without approach slabs respectively, suggested the tolerable differential movement of embankment/structure interface and the tolerable differential slope of approach slab as the tolerable differential settlements, selected three freedom degrees system and five freedom degrees system as the models for the roughness testing vehicle with only one wheel and the vehicle with two axles respectively, and emphasized that the inertia moment of vehicle body in five freedom degrees system couldn't be ignored. The allowable differential slope of approach slab [Δz] is 0. 4% to 0. 5%. When the tolerable maximum transient vibration value was 1. 0 m/s2, [Δi] is 0. 42%. The result indicates that the models are reasonable.
出处 《交通运输工程学报》 EI CSCD 北大核心 2005年第1期19-23,共5页 Journal of Traffic and Transportation Engineering
基金 陕西省交通科技项目(2001013)
关键词 道路工程 桥头跳车 最大瞬态振动值 容许差异沉降 计算模型 车辆模型 Degrees of freedom (mechanics) Embankments Mathematical models Surface roughness
  • 相关文献

参考文献7

  • 1冯忠居,方贻立,龚坚城,朱建斌.高等级公路桥头跳车的危害及其机理的分析[J].西安公路交通大学学报,1999,19(4):33-35. 被引量:131
  • 2叶见曙.桥头引道工后沉降控制标准的研究[J].东南大学学报(自然科学版),1997,27(3):12-17. 被引量:56
  • 3Wahls H E. NCHRP synthesis of highway practice 159:design and construction of bridge approaches[R]. Transportaion Research Board, National Research Council, Washington, D. C. ,1990.
  • 4赖国麟.关于桥头搭板沉降坡差容许值的建议[R].南京:东南大学,1994..
  • 5Thiele J,Maher K T,Joseph V B. State of the art for control of bridge approach settlement[A]. Bridge Evaluation Repair and Rehabilitation[C]. USA. Kluwer Academic Publishers,1990.
  • 6钟阳,刘季.路面车辆随机动荷载理论分析[J].工程力学,1993,10(4):26-31. 被引量:4
  • 7日本道路协会.道路土工软土地基处理技术指南[M].北京:人民交通出版社,1984..

二级参考文献12

  • 1叶见曙,赖国麟,蒋爱祥,董祥图.宁通一级公路扬江段桥头搭板的调查与分析[J].华东公路,1995(6):27-30. 被引量:27
  • 2王广山.桥头跳车原因分析及预防措施[J].东北公路,1996,19(2):37-39. 被引量:19
  • 3凌治平.基础工程[M].北京:人民交通出版社,1990..
  • 4团体著者,桥梁地基与基础,1991年,40页
  • 5蔡恩捷,道路土工软土地基础处理技术指南(译),1984年,7页
  • 6张奎鸿,华东公路,1983年,3期,1页
  • 7程翔云,公路,1997年,12期
  • 8孙江,华东公路,1997年,4期
  • 9王广山,东北公路,1996年,2期
  • 10凌治平,基础工程,1990年

共引文献178

同被引文献86

引证文献19

二级引证文献208

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部