摘要
结合最优生产技术(OPT)与ERP的特长,提出了基于OPT的ERP作业计划编制方法,将计划编制划分为预编制、冲突判断、关键作业计划编制等环节;同时,对关键技术如工作中心任务分解、关键工序前后作业时间给出了数学推导公式;结合应用实例,对基于OPT的ERP作业计划编制方法进行了有效性验证。
Combining merits of optimized production technology (OPT) and ERP, we developed a new ERP Shop Job scheduling method based on OPT. In this method, the job scheduling was divided into several parts such as pre-scheduling, judgment of conflict, job scheduling of key shop etc. At the same time, mathematic formulae were established for key techniques like decomposition of work center, fore-and-aft times of key shop. In the end, the validity of this method was tested in practice.