摘要
采用预先危险分析(PHA)与作业危险分析(THA)相结合的方法,对某大厦的爆破施工、起爆、爆破后等实施过程的危险性进行了分析与评价.根据评价结果,提出了整个爆破拆除工程中可能产生危险的安全对策与措施、应急预案,并对项目设计、施工组织提出了评价结论.
The hazard before, in and after demolishing of a mansion was analyzed and evaluated accordings to the methods of Preliminary Hazard Analysis (PHA) and Task Hazard Analysis (THA). Based on evaluation results, the safety measures and urgency counterplans are presented to deal with the urgency which is likely to occur in the demolishing process. The evaluation conclusions of this project have been given.
出处
《中国计量学院学报》
2005年第1期51-55,共5页
Journal of China Jiliang University