期刊文献+

46 thermal power plants are ordered to make desulphurization in the stated time

下载PDF
导出
摘要 Recently, the State Environmental Protection Administration has published a name list of 46 thermal power plants which haven't started desulphurization projects yet and requires these plants to complete their desulphurization projects to the appointed time schedule and dispatched the Notice on Strengthening Supervision and Management of Key Thermal Power Desulphurization Project in the 10th Plan of Controlling Acid Rain and SO2 Pollution in the Two Control Zones.
出处 《Electricity》 2005年第1期4-4,共1页 电气(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部