期刊文献+

水电机组的启动成本模型以及控制分析

下载PDF
导出
摘要 随着我国电力体制改革,推行“厂网分离、竞价上网”,发电公司在运行方案上做了大副调整,不再是传统的发电机组设计成元间断的连续运行,而由于负荷变化频繁,波动幅度剧烈,导致越来越频繁的起停机组。我国的水力资源丰富,加之水轮机组具有启动灵活、升降出力速度快、调节性能好的特点,并且运行成本比火电机组明显较低,因此在短期发电调节中占有绝对的优势。
出处 《贵州电力技术》 2005年第3期4-7,共4页 Guizhou Electric Power Technology
  • 相关文献

参考文献5

  • 1J- P Chancelie and A. Renaud,"Daily Generation Scheduling:Decomposition methods to solve the hydraulic problem", Electrical Power & Energy System,Vol. 16 No.3,1994,pp. 175 - 181.
  • 2H. Tomeoka, H. Nakajima, Y. Kawachi, S. Nakamura and N.Watanabe, "New Daily Hydro Scheduling System for Multi Chain Hydro Power System", Engineering Intelligent System, no 1, 1994,pp.23 - 29.
  • 3Thor Bjorkvoll, Bjom H. Bakken, "Calculating The Start Up Costs of Hydropower Generators", 14th PSCC, sevilla, 24 - 28 June 2002.
  • 4O.Nilsson, D.Sjelvgren,"Hydm Unit Start Up Costs and Their Impact on Short Term Scheduling Strategies of Swedish Power Producers", IEEE Trans. On Power Systems, Vol. 12, No.1,1997,pp.38- 44.
  • 5王雁凌,张粒子,杨以涵.市场条件下的机组启动费问题[J].电网技术,2002,26(12):53-56. 被引量:11

二级参考文献3

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部