摘要
本文通过试验,结合本矿实际条件,较全面地论证了二级表外铀矿石堆浸的技术经济可行性,并提出了两个有价值的建议。
It was proved that it is feasible in economy and in technology to recover uranium from Dongkeng second class submarginal ore by heap leaching,on the basis of analysing the conditions of Mine No.743 and the tests conducted.Moreover,the social and environmental effects are good.Two valuable suggestions are presented in this paper.
出处
《铀矿冶》
CAS
1994年第2期81-86,共6页
Uranium Mining and Metallurgy
关键词
堆浸
铀矿石
矿山开采
Heap leaching
Feasibility
Economical benefit