摘要
针对目前泵站加热炉放空是通过打开紧急放空阀向污油池泄放这一做法之不足,将一50m^3卧式罐稍作改造,作为临时放空罐代替污油池,并增设加热炉紧急放空污油回收系统,极好地将污油回收到3000m^3储罐中。介绍了污油回收及泄放系统的工艺流程,分析了加热炉泄放系统改造的原因,从安全角度出发,对罐的安装位置及方式做了说明,阐述了使用该系统应注意的一些问题。
Recently, furnace discharging is performed by opening the emergency relief valve and drain oil into the sump oil pool,which is not a favourable solution. For this reason, a 50m3 horizontal tank, after being renovated, can be used as a temporary venting tank to replace the sump oil pool with an emergently discharged sump oil system added to the furnace. In this way ,sump oil can be stored in the 3000m3 tank. The authors introduce in the paper the process flow of sump oil discharge and recovery system with the reason analysed why the furnace relief system is necessary to be improved. The position of the tank is clearly stated from safety point of view together with points for attention if the system is applied.
出处
《油气储运》
CAS
北大核心
1994年第3期53-54,共2页
Oil & Gas Storage and Transportation
关键词
加热炉
技术改造
输油气泵站
pump station,furnace,technical renovation